Concrete contractor in Shaker Heights, OH - slabs built to shed water
Shaker Heights Concrete is a concrete contractor based in Shaker Heights, OH. We replace driveways, walks, steps, patios and garage floors here, digging out to a firm base and pitching each slab so water runs away from your house.

Shaker Heights: older homes, patched driveway slabs
Shaker Heights was planned as a Cleveland suburb in the early 1900s, and a lot of the houses we work on here date from those first decades. Most of our calls come from homeowners whose driveway, front walk and steps have been patched more than once, and some come from small property owners keeping up their buildings.
We get the same kind of call in Beachwood. On a house this age, though, the old concrete has usually been replaced a piece at a time over a base nobody dug out, and the ground around it rarely sends water away from the house the way it should, so before I price anything I look at what's underneath and where the water goes.
- Licensed and insured.
- Free estimates at your property.
- We respond within 1 business day.
Concrete work we do in Shaker Heights
Concrete driveway building
Older driveways here often sink or pool water by the garage. For a new concrete driveway we dig out to firm ground, pack the base and slope it to drain.
Concrete sidewalk building
Front walks here often heave and catch a toe. We replace bad sections over a packed base and cut control joints, grooves that tell cracks where to go.
Concrete steps construction
Steps on houses this age often crumble at the edges or pull away from the porch. We pour new ones with each tread pitched so water runs off.
Garage floor concrete
Older garages here often have cracked, sunken floors that hold water by the door. We take the floor out, rebuild the base and slope the new slab toward the door.
Concrete patio construction
Old backyard patios here often tip toward the house and pool water at the door. We pour new ones pitched away, with a broom finish for grip.
Concrete cutting
Many jobs here need one bad section out, not the whole slab. We saw-cut clean lines so it comes out without cracking the concrete you're keeping.
Working in Shaker Heights: permits, licenses and what moves the price
Permits here come from the city's Building & Housing Department, and city guidance says most construction past paint, flooring and other finishes needs one. Changes to the outside of a property also need Planning Department approval, and sometimes a look from the Architectural Board of Review, so on outdoor concrete your start date usually rides on those reviews more than on our calendar. Before you hire anyone, check that they hold the City Contractor License that permit work here requires. We're licensed and insured, and when a job needs a permit we pull it, line up the city inspections and build to what the department approved.
What moves the price is mostly what you can't see on day one: how much old concrete comes out, how deep we dig to reach firm subgrade, and how much regrading it takes to send water away from your house. A narrow drive back to a garage can slow the tear-out and the pour, and a thicker slab or rebar, steel that holds cracks tight, adds to the cost, so I walk the job with you at the estimate and spell out what's included, like taking out the old concrete. We do the same work in University Heights and Cleveland Heights, and if your city isn't on our list, call and ask.
Get a free on-site concrete estimate in Shaker Heights
We respond within 1 business day of your call or message, with no pressure and no obligation. I'll come out to your Shaker Heights property, walk the job with you and explain what's included, and if you go ahead, our own crew does the work.
- Licensed and insured.
- Free estimates at your property.
- We respond within 1 business day.
Concrete ideas for Shaker Heights homes
Shaker Heights concrete questions
Do I need a permit to replace my driveway in Shaker Heights?
Yes, the city lists driveway replacement among the work that needs a permit. For a walk, patio, steps or garage floor, we'll check with the city before we start rather than guess, and when a permit is needed we handle it as part of the job.
Can I pull my own permit for concrete work in Shaker Heights?
Yes, city guidance lets a homeowner pull a permit for work you do yourself or for work by a paid licensed contractor. You'd fill out a homeowner's affidavit with the application, and the city requires anyone doing permit work to be insured. If we're doing your job, we pull it so you don't have to.
Does my concrete contractor need a Shaker Heights city license?
Yes, any contractor doing permit work here needs a City Contractor License each year before starting. Registrations run out on December 31 of the year they're issued, so if your project carries into the next year, the license has to be renewed.
How much does a new concrete driveway cost in Shaker Heights?
I price each driveway after I've seen it, because what's under it and how much old concrete comes out matter as much as its size. The base is hidden the day we pour, so it's the first thing people want to cut, and it's the last place I'd save money, since a weak base is what sinks a slab. If you need to bring the price down, a plain broom finish costs less than stamped or decorative work.
What causes a concrete driveway to sink or crack?
Most of the sinking and cracking I fixed in years of building upkeep came from a weak base or from water with nowhere to go. A base that's raked level instead of dug out and packed settles with the dirt, and a slab that falls toward the house sends water right where it does the most harm. We dig out and pack the base, pitch the slab away from your house and cut the control joints on time, so if the new slab cracks, it cracks along the lines we chose.
How long does a driveway replacement take in Shaker Heights?
The time you're without a driveway mostly comes down to two waits, the city's review before we start and the curing after we pour. Curing is the stretch when new concrete gains its strength, so you can walk on it well before you can drive on it, and parking too soon is a common way to crack a new slab. I'll give you the dates for your driveway when I come out.




