Concrete footings in Shaker Heights OH - set on solid ground for your deck
Building a deck or replacing posts that heave every winter? We dig each footing to solid ground so what you build has firm support.

What does it take to get deck footings right in Shaker Heights?
Concrete footings are the concrete supports under a deck or other heavy load. In Shaker Heights we dig them deep and set them on solid ground, so freezing and thawing ground is far less likely to move the posts above.
Most footing calls I get are for a new deck, or for an old one whose posts have started to lean or lift and need new support underneath. The price moves with how many footings you need, how big each one has to be for your soil, how hard the digging is and whether old concrete has to come out first. The schedule turns mostly on the permit and inspections and on the mix we pour, since the mix sets how long the concrete has to cure and harden before anyone builds on it. We're based in Shaker Heights and work in many of the cities around it, and at the estimate I'll walk the spot with you and explain what's included.
- Licensed and insured.
- Free estimates at your property.
- We respond within 1 business day.
Footings and the concrete work around them
How we pour concrete footings
We start by marking each footing from your plan and asking where the water runs on your lot, because a footing in ground that stays wet is the one most likely to move. Then our crew digs, and no concrete goes in until I've checked the bottom of every hole, since footings carry everything above them and dirt that's been dug up and thrown back will settle under that weight. We set a form in each hole and pour, and I'll tell you which mix we're using so you know when framing can start. If something in the budget has to give, I'd rather it come off the deck boards than the digging, because the hole is the part nobody sees once the deck is built and it's the part doing all the work.
Footings often come with other work. If an old pier, slab or walk is in the way, concrete cutting lets us take out just the section we need instead of breaking up more than we have to. And if it's your house that has settled rather than a deck, that calls for foundation raising, which I'm glad to look at on the same visit.
Why Shaker Heights homeowners call us for concrete footings
I come out, our crew pours
I'm the one who comes out, looks at the ground and gives you the estimate, and our own crew does the digging and pouring. The person who planned your footings is the one you call with a question, and I'm happy to answer the same one twice.
Pouring concrete since 2013
We've been in business since 2013, and before that I did upkeep for a property management company, patching walks, steps, driveways and garage floors. Most of what I fixed failed because water had nowhere to go or the ground under it was weak, so that's where I spend my time on your footings.
Licensed and insured on your property
We're licensed and insured. That matters when a crew is digging holes right next to your house, because you shouldn't be the one carrying the risk of the work.
Ready for the city's inspections
Once Shaker Heights reviews a permit application, it sends a list of required inspections, and we line them up and work to the building department's approvals. If the building official wants a soil test because your lot may have soft or shifting ground, I'll let you know early, since that call is made one location at a time.
On a footing job, what counts is what's at the bottom of each hole, so ask me as many questions as you like before we pour. Request an estimate or call (216) 954-5951.
Get an on-site estimate for your deck footings
Send the form with what you're building and where it'll sit, and we'll reply within one business day to set up a free estimate at your property. No pressure, no obligation.
- Licensed and insured.
- Free estimates at your property.
- We respond within 1 business day.
What happens when you call about footings in Shaker Heights?
Tell us what you're building
Call (216) 954-5951 or send a message with what you plan to build and where it goes on your lot. We'll set a time for me to come out.
I walk the spot with you
I measure, ask how you'll use the space and where the water runs after a storm, and look at the ground where each footing will go. You get an estimate that spells out what's included, such as taking out old concrete, so you know what you're paying for before you decide.
Our crew digs and pours
When the job needs a permit, we pull it first, and then our own crew digs, forms and pours each footing. The mix we use sets how long the concrete cures before your framer can start.
We go over it together
I go over the finished footings with you before we call the job done, while you can still see what's in the ground. The work is backed by our satisfaction guarantee.
Questions about concrete footings
How deep do concrete footings need to go in Shaker Heights?
Footings usually need to reach below the frost line, so the ground freezing around them can't push them up. Ohio's residential code also requires them to rest on undisturbed natural soil or engineered fill, which is why I check the bottom of every hole. On your lot, the right depth gets you below the frost and down to solid ground.
Who issues building permits in Shaker Heights?
The city's Building & Housing Department issues permits for all residential and commercial construction projects in Shaker Heights. When your job needs one, we pull it and work with the department, and if you're unsure about your project, we'll check before we start.
Does my contractor need a city license to work in Shaker Heights?
Yes. Shaker Heights requires any contractor doing work that needs a permit to get a city Contractor License each year, before starting work. It's a fair thing to ask any contractor you're considering, us included, and the city explains the rule on its contractor license page.
How long do concrete footings need to cure before building a deck?
One concrete maker's guide says about one day of curing before building a deck on new footings, or about three days with a standard concrete mix. That's why I tell you which mix we're pouring, so your framer can plan the start.
What causes deck footings to heave or shift in winter?
Usually frost heave, which happens when ice layers form in the ground and lift the soil. A North Dakota extension guide says it's more likely when the water table is high and the soil is clay or silt rather than well-drained gravel. That's why I ask where the water runs on your lot and get each footing down past the frost line.
How much do concrete footings cost in Shaker Heights?
Your own figure comes from the estimate, after I've walked the spot, because the cost turns on how many footings you need, how big each one is and what it takes to dig them. Ohio's residential code sets each footing's width by how much weight your soil can carry, so softer ground can mean wider footings. One form seller's guide says a bell-bottom form spreads the load over a wider base, which in softer soils reduces settling and can cut the number of piers a job needs, so on some lots it's worth asking about.
Work that often goes with concrete footings
Concrete cutting
Saw-cutting opens a neat gap in an existing patio, walk or garage floor so a new footing can go in without tearing out the rest.
Foundation raising
If floors slope, doors stick or cracks run along your foundation, the house itself may have settled, and raising it is a different fix from new footings.
